The IT Side of Moving Office: What to Sort Out Before Moving Day

Key Takeaways: 

  • IT planning should start well before moving day, especially for connectivity, cabling and phone systems. 
  • Verify the new office’s internet availability, network infrastructure, power and comms setup before assuming the space is ready. 
  • Map out what equipment is moving, what needs replacing and what has to be installed in advance. 
  • Test connectivity, Wi-Fi, phones and shared systems before staff arrive where possible. 
  • Have a fallback plan in place in case part of the new setup is delayed. 

Two dates tend to anchor an office move. One is the day the lease ends and the other is the day the removal firm turns up. Neither says anything about when people can work in the new place, and that depends on things a van can’t carry, like the internet connection and the cabling behind the walls. Each has a timetable of its own, and the slowest one decides when the office is ready, whatever the diary says. 

Laptops are the easy part 

Equipment is easy to picture, which is why it dominates the removals plan. Screens get wrapped, and laptops go into boxes. The harder part is everything those devices rely on at the other end, from connectivity and Wi-Fi coverage to power points and phone services. That environment is what a moving office IT setup is about, so it starts with a plain comparison of what the business uses now and what the new premises already provide. The difference between the two is that ordering and installation still need to be completed, and that list must be created before the move date is fixed, because some of it can’t be done in a rush. 

Some suppliers need weeks of notice 

Finding out two days before the move that something needs ordering doesn’t mean it arrives two days later. Internet connectivity is the clearest case. Openreach, which looks after much of the UK’s broadband network, says timings depend on what’s already at the new address and whether an engineer needs to do extra work first. Once a provider confirms a date, though, it’s the one the rest of the plan works back from. 

Phones run on the same logic. A business number is printed on invoices and listed on the website, so it has to survive the move. Ofcom describes keeping your number when you change providers as a regulated facility, but the transfer still must be requested and timed around the move. Cloud telephony, including Microsoft Teams voice calling, can keep existing numbers and follow people to any device, which takes one dependency off the new premises. 

There’s also a hard deadline in the background. Openreach is retiring the old analogue phone network, the PSTN, on 31 January 2027 and has warned that services still connected to it may stop working unless they’ve been upgraded or replaced. A new address that still relies on analogue lines is a problem you’d be taking on along with the lease. 

The lease is the cheapest time to ask about the cabling 

Before you sign, a weakness in the building is something to raise with the landlord. After you sign, it tends to become your cost. The questions worth asking are concrete. What internet services reach the building, and where do they come in? Is there a comms cupboard in the right place for your layout? Does existing cabling match where you want desks, phones, printers and meeting-room equipment? Can Wi-Fi cover the floor plan without blind spots? Are there enough power and data points for the number of users? Do door access, CCTV, alarms or printers rely on the network? What will the landlord allow for cabling, drilling and engineer access? 

A standard moving checklist can’t answer these points because the answers belong to one building. IT support for office moves earns its keep at the property stage. It’s the walk-through 4TC does for small and medium-sized businesses planning a move in London or Hertfordshire. 

An office relocation IT checklist, in the order the work needs doing 

A good office relocation IT checklist works as a sequence. Anything with a lead time goes first, and anything that depends on something else waits for it. 

Several weeks or months before the move 

  • Audit the current IT environment and confirm the new floor plan and number of users 
  • Check connectivity options and inspect the existing network and power infrastructure 
  • Identify anything that needs ordering or installing 
  • Decide which equipment moves and which is replaced or retired 
  • Map printers, phones, meeting-room equipment and other shared devices 
  • Confirm how cloud and on-premises systems will be affected 
  • Coordinate suppliers and building access 

Before moving day 

  • Confirm connectivity is live and tested where possible 
  • Configure networking and Wi-Fi 
  • Label equipment and record where it’s going 
  • Confirm telephone routing and numbers 
  • Give staff clear instructions on what they need to do 
  • Agree on a fallback plan for anything that can’t be finished before occupation 

This is the planning 4TC coordinates through its Installation and Relocation service, drawing on many years of moving companies’ IT infrastructure to bring the separate pieces of a move together before they become problems on the day. 

Someone has to decide the office is ready 

Most plans cover the move and say little about the stretch between switching off at the old office and starting work at the new one. A good plan states when the old office stops operating, when the new one becomes usable, what happens to calls during the change, whether people can work remotely if anything slips, and who tests connectivity, Wi-Fi, printing, phones and shared systems. 

Testing deserves that much weight because an installation can be signed off while something people rely on still doesn’t work. A supplier marking a job complete means their part is done, and it says nothing about what the next person needs. 

If you can’t say today who will declare the new office ready or what they’ll check before they do, the plan isn’t finished. The aim is for the business to carry on working from the new location with as little interruption as reasonably possible, and moving the equipment is only the first step toward that. 

If an office move is on your calendar, get the technology side mapped out well before moving day. Speak to 4TC about Installation and Relocation support so your connectivity and equipment are ready for the new office.

Custom Databases for SMEs: When Spreadsheets Stop Being Enough

A spreadsheet doesn’t set out to run a business. Someone builds it to track one thing, a supplier list or a job log, and it works well enough that other people start using it too. Then customer records go in, and stock counts and job notes, and the numbers behind a monthly report, until three or four people are opening the same file every day. The spreadsheet became the record system for part of the business without anyone deciding that it should, one added column at a time. 

The tool is the same. The job it’s being asked to do isn’t, and that’s what decides whether a spreadsheet still fits or the business has quietly turned into a database problem. 

The signs a spreadsheet has outgrown its job 

A handful of signs tend to show up as the issue happens, and each one says something about how the process has grown. The software itself isn’t the issue. Several people start working from the same file at once, and duplicate or slightly different versions of the same record creep in because two people typed similar information into two different rows on the same day. Extra tabs and side spreadsheets start multiplying, each one built to work around something the original file can’t do. Reporting turns into someone rebuilding a summary from scratch every month, when a live view of the same information is already sitting there. 

Excel isn’t at fault for any of this. A worksheet holds data in one flat table, up to 1,048,576 rows and 16,384 columns, according to Microsoft’s published specifications. The strain shows up the moment a business needs to link two or three of those flat tables together in someone’s head, cross-checking a customer list against a job log, which is precisely the job a database is built to do. 

Why buying another app doesn’t always fix it 

Buying a CRM or a project management platform is often the obvious next step, and for plenty of businesses it’s the right one. Standard software works well when a company’s process looks like everyone else’s, taking a customer through a typical sales cycle or tracking projects with clearly defined stages. The government’s SME Digital Adoption Taskforce sets out an ambition built on adoption of tools like cloud computing, CRM and resource planning software, estimating that even a 1% productivity uplift across UK SMEs could add £94 billion a year to GDP. 

The friction shows up once a process doesn’t match the software’s assumptions. A business with unusual stages or industry-specific fields gets forced into a generic structure, and staff end up keeping a parallel spreadsheet to capture what the software can’t hold. Buying a second tool to cover what the first one leaves out can end up rebuilding the fragmentation the business was moving away from. 

What changes once the data lives in a database 

Microsoft’s own guidance on the two tools draws a clear line between them, with Excel suited to calculation, analysis and visualisation, and database software built for capturing, storing, querying and sharing information across a team. 

Customer records, orders and stock levels become related tables that link to each other, so updating a customer’s address in one place changes it everywhere that record appears. There’s one current version of the information, because everyone is drawing from the same underlying data. Different people can be given different levels of access, so someone can update part of a record without seeing everything else it holds, something a shared spreadsheet can’t really enforce. Reports pull from live data, and routine steps, like flagging something overdue, can happen automatically, without anyone needing to remember to check. 

The kinds of processes that hit this first 

Stock and asset tracking is a common one. Products, quantities, locations and suppliers all need to stay linked as an item moves from arriving in stock to being invoiced against a job, and a spreadsheet struggles to hold that many moving parts without breaking. Customer and client records run into the same wall once contact details, orders, correspondence and service history need to sit against one record. And plenty of businesses simply run processes that don’t look like anyone else’s, with approvals, handoffs or sequencing that was never going to map onto a generic CRM or project tool. These aren’t case studies so much as patterns worth checking a business against, because the real test is how closely its own process matches the software already on the market and how much gets forced out of shape when it doesn’t. 

Deciding if custom database development is worth it 

Company size is a poor guide here. A five-person operation can run a genuinely complicated process, and a business with fifty staff can be served perfectly well by something off-the-shelf. What matters more is something closer to the ground, starting with how much daily operations depend on the process, and how much staff time gets swallowed by manual copying, double-checking and extra spreadsheets covering what’s missing. The same goes for how specialised the process is, and how many people depend on the exact same information at the same time. A business already contorting itself around software that doesn’t fit its process is another strong signal, and so is data that constantly needs shifting between systems that don’t talk to each other. Taken together, those factors are a far better guide to custom database development than the size of the business will ever be. 

Getting from spreadsheet to database 

A bespoke database is a natural continuation of a well-used spreadsheet. The Claris FileMaker platform exists to build custom business applications shaped by how a company already works, and it runs natively across Mac, Windows, iPad, iPhone and the web, with role-based access and record-level security built in from the start. 

4TC builds FileMaker solutions from its London and Hertfordshire offices, and every project starts with the process that’s already there. The usual sequence is understanding how information moves through the business, working out what people need to see and do at each stage, and shaping the system around that before any existing data gets moved across. If a customer or stock spreadsheet already exists, that becomes the starting point for the new system. Anyone who recognises their own spreadsheet in the examples above might find it worth a look at 4TC’s FileMaker development work.